Director (Technology)
directortech@indiapost.gov.in (Email: 28.03.2016)1:58 PM (53 minutes ago)
In response to your
concerns regarding CBS functioning, I am directed to inform the following:
2. Two additional servers
are being provided at the Data Centre today so that additional load can be
absorbed.
3. The Business Continuity
Plan (BCP) has been permitted by the FS Division from 23.03.2016. This will
enable operations to be done across the counter.
4. An Emergency Response
Team (ERT) has been constituted at CEPT, Mysuru to deal with outages.
5. A top to bottom review
of the Application is being undertaken to ensure smooth operations.
Your co-operation is
sought for effective implementation of CBS.This issues with approval of Member
(Technology).
sd/-
B.P.Sridevi