Scroll Notifications
Showing posts with label SIFY. Show all posts
Showing posts with label SIFY. Show all posts
Friday, March 10, 2017
Saturday, May 7, 2016
Check your office Sify Latency
Click Here to view the list of offices in A.P Circle where Sify Latency is more than 100msec. If it is more than 100msec, network connectivity will be poor. If Sify Latency is more than 100m sec, ask your D.O to raise ticket with Sify.
Tuesday, April 26, 2016
Check Internet Connectivity With Sify_DNS Or CSI_DNS Tool
Download Attached file Save as per Below Screenshot Location :
Download Sify Connectivity Testing Tool
- Text File Will be created after successful Execution of exe to C:\PING
Send The Created " Ping_Result.txt " File to dop.helpdesk@sifycorp.com
- For Low Bandwidth Or Unstable Internet Connectivity Issue
Developed by,
Vikram M. Paraghi
System Administrator
Bilimora HO - 396 321
Wednesday, April 20, 2016
Minimum SIFY bandwidth of TNF locations
Extract of letter from C.O to Unions on increase of SIFY bandwidth of TNF locations (Technically Non Feasible) where only NSP-2 is available:
--
It is to bring to your notice that as per Directorate
vide letter No.46-12/2015-Tech dt 05.02.2016, Circles are delegated
with the power of up gradation of NSP1 Bandwidth for D&E class
offices to 512 kbps (minimum bandwidth as per national policy).
Accordingly the feasible 2050 locations bandwidth upgradation approval
is given to M/S SIFY. Out
of which SIFY has upgraded the Bandwidth in respect of 2011 locations.
Remaining 39 locations are pending for want of issuance of WAN
acceptance by the Divisions. Consequently Directorate vide letter
No.46-12/2015-Tech dt 15.03.2016 has approved the upgradation of NSP2 to
next higher level in 196 locations, where NSP1 is TNF. In these
locations, NSP2 existing bandwidth is 128 kbps, hence the upgradation is
to be done to a minimum of 512 kbps instead of 256 kbps as approved by
Directorate. This has been taken up with Directorate vide this office
letter No. EDP/PMU/NI implementation/2014-15 dated 12.04.2016. In this regard, kindly find the attachment of all class D & E locations which are apgraded to 512 Kbps on NSP1.
I
am directed by the Competent Authority to request to not resort to
proposed action as it will demoralize the staff and give negative
message to public.
--
With regards,
DDM (PLI)
Union Cell
O/o the CPMG
A.P. Circle
Hyderabad - 500 001
Wednesday, April 13, 2016
Minimum SIFY bandwidth is now 512kbps
All Sub Offices where SIFY bandwidth was 256kbps is now increased to 512kbps w.e.f 07.04.2016 in A.P. Circle.
Click Here to view the list of offices in A.P. Circle in respect of which bandwidth is increased from 256kbps to 512kbps.
Saturday, April 9, 2016
Sunday, March 13, 2016
Tuesday, March 8, 2016
Optimal utilization of Sify bandwidth
Click here to view directorate instructions dated 19.02.2016 on optimal utilization of Sify bandwidth.
Required browser setting files for Finacle and McCamish are available at the following link:
Username: apco
Password: apco
Wednesday, March 2, 2016
Upgradation of SIFY bandwidth in post offices
Click Here to view the C.O letter dated 29.02.2016, with a direction to SIFY to increase bandwith of all Post Offices.
Click Here to view the list of offices identified for SIFY bandwidth upgradation in A.P Circle.
Friday, February 26, 2016
Check Sify Connectivity and bandwidth usage
To check whether your office is under SIFY network or not, click the following link and check the details:
Website link (NMS Tool): fault.indiapost.gov.in:8080
(Link to be pasted in the browser)
User name : dopcircle_ap
Password : dop@ap
To check the bandwidth usage of your Sify network:
Website link : reports.indiapost.gov.in
User name : dopcircle_ap
Password : dop@ap
Note: Check the bandwidth usage of your office. Only when the
bandwidth usage is above 80%, bandwidth will be
upgraded to the next level.
Website link (NMS Tool): fault.indiapost.gov.in:8080
(Link to be pasted in the browser)
User name : dopcircle_ap
Password : dop@ap
To check the bandwidth usage of your Sify network:
Website link : reports.indiapost.gov.in
User name : dopcircle_ap
Password : dop@ap
Note: Check the bandwidth usage of your office. Only when the
bandwidth usage is above 80%, bandwidth will be
upgraded to the next level.
Friday, February 19, 2016
Revised procedure for SIFY bandwidth upgradation
Click Here to view the revised procedure to be followed for SIFY bandwidth upgradation.
Thursday, December 10, 2015
Tuesday, November 24, 2015
Tuesday, November 3, 2015
Sify bandwidth upgradation
Click Here to view the Directorate orders on Sify bandwidth upgradation. As per Directorate orders, offices with NSP-1 with 256Kbps need not refer for bandwidth upgradation as it will automatically be upgraded to 512Kbps by Sify.
Click Here to view the C.O orders addressed to Sify authorities for bandwidth upgradation.
Click Here to view the list of offices in A.P Circle with sify bandwidth of 256kbps (NSP-1).
Wednesday, October 7, 2015
Sify non feasible locations
Click Here to view the list of post offices which are identified as technically non feasible (Sify network connectivity problem) locations.
Thursday, July 16, 2015
Mac binding of systems on 16.07.2015 and 17.07.2015
It is informed by RO that
mac binding(Computers
with a specified MAC address can only send and receive information with the
associated IP address) of the following Post Offices
will be done during 16/07/2015 to 17/07/2015.
S
No
|
WEGCODE
|
Category
|
Name of Location
|
No
of Systems as per Feasibility Report
|
1
|
WEG00559
|
E
|
Motilal Street S.O--515004
|
1
|
2
|
WEG00564
|
E
|
Putlur S.O--515414
|
1
|
3
|
WEG00557
|
E
|
Kundurpi S.O--515766
|
1
|
4
|
WEG00568
|
E
|
Rayadurg Bazar
|
1
|
5
|
WEG12080
|
E
|
Timmanacharla S.O--515801
|
1
|
6
|
WEG26175
|
E
|
ATP West Sub Division
|
1
|
7
|
WEG00540
|
E
|
Bukkarayasamudram S.O--515701
|
1
|
8
|
WEG26179
|
E
|
IP,Rayadurg Sub Division
|
1
|
9
|
WEG00549
|
E
|
Jayalakshmipuram S.O--515722
|
1
|
10
|
WEG00541
|
E
|
Chukkalur S.O--515415
|
1
|
11
|
WEG00539
|
E
|
Bommaganipalli S.O--515763
|
1
|
1. The above
Post Offices must keep all the systems powered on during Working Hours during 16/07/2015
to 17/07/2015.
2. The System Admin of the location should ensure that the Sleep Mode/ Hibernate Mode(in Power Options) should be disabled for all the PC's available in the Locations so that all the systems are available live during the entire working hours during 16/07/2015 to 17/07/2015.
2. The System Admin of the location should ensure that the Sleep Mode/ Hibernate Mode(in Power Options) should be disabled for all the PC's available in the Locations so that all the systems are available live during the entire working hours during 16/07/2015 to 17/07/2015.
3. The
Locations are requested to ensure all the Systems available in the office are
properly connected to LAN Network.
Monday, June 15, 2015
Sify contact details
Phone/Telephonic Phone – UAN – 1860-345-8888
Phone No : 044-22540985 ( CHENNAI)
Phone No : 022-26100113 ( MUMBAI )
Complaint Web Portal ====>>Site : http://servicedesk.indiapost.gov.in:8080
Site :- http://172.16.5.16:8080/CAisd/pdmweb.exe (In Active Directory )
Helpdesk Email To: dop.helpdesk@sifycorp.com
CC: helpdeskcept@indiapost.gov.in.
Anantapur District in-charge- Venkat Reddy-73865 44454
Region in-charge -Sayyed - 99638 75817
(In case of any Sify problems, please contact above numbers)
Site :- http://172.16.5.16:8080/CAisd/pdmweb.exe (In Active Directory )
Helpdesk Email To: dop.helpdesk@sifycorp.com
CC: helpdeskcept@indiapost.gov.in.
Anantapur District in-charge- Venkat Reddy-73865 44454
Region in-charge -Sayyed - 99638 75817
(In case of any Sify problems, please contact above numbers)
Saturday, March 21, 2015
Sify migrated offices
Click Here to download the list of post offices migrated to SIFY network (NSP-1, NSP-2 and both).
Tuesday, February 24, 2015
Subscribe to:
Posts (Atom)











